Search for your permit

Search returned 95 results

  • Septics System Construction Permit

    Wastewater Permits Program - Wells and Septic Division

    Any individual or property owner who desires to have a sewage disposal (septic) system installed on their property or requiring repair to an existing system must get a Septic System Construction Permit.

    Processing Time: 120 Days
    Expected Fee: $150 - $500
  • Sewage Sludge Utilization Permit

    Resource Management Program

    The application of sewage sludge to land returns essential nutrients to the soil, adds organic matter, and can improve the tillabilty and moisture retention capability of the soil. A sewage sludge utilization permit is required by the Maryland Department of Environment for any person who treats, composts, transports, stores, distributes, applies to land, incinerates, conducts innovative or research projects or disposes of sewage sludge or septage (effluent from septic tanks) in Maryland. Sewage sludge (also known as biosolids) is not sewage. It is one of the final products of the treatment of sewage at a wastewater treatment plant. After treatment to break down the organic matter and destroy disease causing organisms, the remaining fine particles ultimately become sewage sludge.

    Processing Time: 36 Months
    Expected Fee: $25 to $750
  • Small Pond Approval

    Stormwater, Dam Safety, and Flood Management Program

    Permit to construct, reconstruct, modify, repair, or remove a dam

    Processing Time: 3 -12 Months
    Expected Fee: $0
  • Small Pond Approval for State and Federal Applicants

    Stormwater, Dam Safety, and Flood Management Program

    Combined plan approval of stormwater management and sediment control for State/federal agencies engaging in earth disturbing activities.

    Processing Time: 3 - 9 Months
    Expected Fee: $0
  • Special Medical Waste Hauler & Vehicle Certification

    Solid Waste Program

    Any hauler who picks up or drops off Special Medical Waste in Maryland must be certified as a MD Hauler and each vehicle must be certified.

    Processing Time: 60 Days
    Expected Fee: $50 (per vehicle)
  • Stormwater Management and Sediment & Erosion Control Approval

    Stormwater, Dam Safety, and Flood Management Program

    Stormwater Management and Sediment & Erosion Control Approval ensures that land development and construction activities are planned and implemented to minimize runoff, erosion, and sediment pollution. The program reviews and approves plans to control stormwater, prevent soil loss, and protect waterways, helping maintain natural hydrologic conditions and comply with Maryland environmental regulations.

    Processing Time: 3 - 9 Months
    Expected Fee: $0
  • Surface Coal Mining Blaster Certification

    Mining Program - Bureau of Mines - Coal Division

    All individuals conducting blasting on surface coal mining operations are required to obtain a blasters certification. Additionally, all blasters must also be licensed by the Maryland State Fire Marshal's Office. A certification must be renewed every three (3) years.

    Processing Time: 30 Days
    Expected Fee: $0
  • Voluntary Cleanup Program Application

    Land Restoration Program

    The Voluntary Cleanup Program is designed to facilitate the cleanup and redevelopment of eligible properties that may be contaminated with hazardous substances or oil. The application process involves submitting detailed information about the property, its environmental conditions, and the applicants interest in the property.

    Processing Time: 60 Days
    Expected Fee: $10,000 (for initial applications)
  • Water and/or Sewerage Construction Permit

    Engineering and Capital Projects Program

    Construction permit for major water and sewer projects

    Processing Time: 90 Days
    Expected Fee: $0 - $2,000
  • Water Appropriation and Use Permit (<10,000 gallons)

    Water Appropriation and Use Permit Program

    This permit is required for any activity that withdraws water from the State's surface water and/or groundwater, unless exempted.

    Processing Time: 1to 18 Months
    Expected Fee: $0