Search for your permit
Search returned 95 results
-
Relaying Oysters for Commercial Harvest
Field Services Program
Permission to relay oysters from polluted waters to approved waters for natural cleansing
Processing Time: 1 DayExpected Fee: $0 -
Resource Management
Resource Management Program
The Resource Management Program within the Land and Materials Administration of the Maryland Department of the Environment regulates several activities to ensure the protection of public health and the environment.
The permit assures the proper management and recycling of organics, including:
- Yard trimmings
- Preconsumer and post-consumer food scraps
- Nonrecyclable paper
- Department-approved animal manure and bedding
- Industrially produced food processing materials
- Animal mortalities
- Manufactured organic materials like waxed-corrugated cardboard, non-coated paper and Other materials that the Department determines pose a low level of risk from hazardous substances and a higher level risk from physical contaminants and human pathogens
This includes both the Individual Composting Facility Permit and the General Composting Facility Permit
Processing Time: 90-165 DaysExpected Fee: $0 -
Responsible Person Training & Certification Program for Erosion/Sediment Control
Stormwater, Dam Safety, and Flood Management Program
Training and certification for construction site operators to ensure proper implementation of MD's Erosion and Sediment Control standards and specifications
Processing Time: 1 DayExpected Fee: $0 -
Scrap Tire Derived Fuel/Substitute Fuel
Solid Waste Program
A Tire Derived Fuel or Substitute Fuel Facility Approval is for permission to utilize scrap tires (whole or chipped) as a fuel or supplemental fuel.
Processing Time: 207 DaysExpected Fee: $0 -
Scrap Tire General Collection Facility
Solid Waste Program
A Scrap Tire Collection Facility License authorizes facilities to temporarily accumulate and transfer scrap tires to Department-approved facilities, with a General Scrap Tire Collection Facility defined as one that holds no more than 50 scrap tires on site at any given time.
Processing Time: 68 DaysExpected Fee: $0 -
Scrap Tire Hauler
Solid Waste Program
A Scrap Tire Hauler is for persons who, as part of a commercial business, transport more than five scrap tires annually to or from a scrap tire facility licensed or approved by the Department.
Processing Time: 68 DaysExpected Fee: $0 -
Scrap Tire Primary Collection Facility
Solid Waste Program
A Scrap Tire Collection Facility License authorizes facilities to temporarily accumulate and transfer scrap tires to Department-approved facilities, with a Primary Scrap Tire Collection Facility defined as one that holds more than 1,500 scrap tires on site at any given time.
Processing Time: 9 MonthsExpected Fee: $0 -
Scrap Tire Recycler
Solid Waste Program
A Scrap Tire Recycler License is for facilities that recycle or process scrap tires into raw materials or products that may be returned to the marketplace.
Processing Time: 9 MonthsExpected Fee: $0 -
Scrap Tire Secondary Collection Facility
Solid Waste Program
A Scrap Tire Collection Facility License authorizes facilities to temporarily accumulate and transfer scrap tires to Department-approved facilities, with a Secondary Scrap Tire Collection Facility defined as one that accumulates up to 1,500 scrap tires on site at any given time.
Processing Time: 68 DaysExpected Fee: $0 -
Scrap Tire Solid Waste Acceptance Facility
Solid Waste Program
A Solid Waste Acceptance Facility Approval is to authorize the processing of scrap tires at any permitted landfill, incinerator, transfer station, or processing facility.
Processing Time: 207 DaysExpected Fee: $0